MEP Work of DATA Centers

data-centers

Flash Electrical have become recognised as one of the leading suppliers in the project management and installation of data infrastructure projects for bespoke, data centre buildings, helping our clients to provide a fully robust back up facility for the secure data housed by the building.

The specialist work includes developing a climate controlled environment including a back up of chilled water circuits, designing and installing appropriate back up power systems with numerous generators and separate sub stations and pipes.

Upgrading a vintage data center’s MEP infrastructure will cost-effectively extend its lifespan by bolstering safety, enhancing flexibility and functionality, increasing serviceability, providing greater scalability, and improving customer perception. Yet the endeavor also comes with its own set of challenges—not the least of which include securing funding, working with outdated documentation, overcoming downtime risks, and ensuring code compliance.